OVERALL SCM STRATEGY

Engineering & Construction projects often demand for continuous movement of supplies of piping materials to the end-user job site or fabrication facility.

The overall objective shall be:

  • Dependability of service levels
  • Highest Quality of materials
  • The reduction in the client’s project costs through replicating and improving HPF’s proven capability for high performance integrated supply chain management throughout the world.
  • Centralised planning to increase efficiency in the utilisation of the resources.

This also presents an excellent opportunity to implement integrated SCM with:

  • Meeting the continuous demand for supplies
  • The optimum use of resources
  • The low cost and safe movement of all materials
  • The elimination of all non-added value processes (unless specifically needed to meet statutory requirements).

OUR UK LOCATIONS

Map of the World

VIEW ALL OUR LOCATIONS

Alcester Head Office

3 Kinwarton Farm Road Arden Forest Industrial Estate Alcester Warwickshire B49 6EH United Kingdom
Tel : +44 (0)1789 761212
Fax : +44 (0)1789 761222

Ellesmere Port

Unit 5 Hoyer Industrial Estate South Road off Bridges Road Ellesmere Port South Wirrall CH65 4LB United Kingdom

Tel : +44 (0)151 357 3322
Fax : +44 (0)151 357 1334

Glasgow

3 Buccleuch Avenue Hillington Park Glasgow Scotland G52 4NR

Tel : +44 (0)141 882 4611
Fax : +44 (0)141 883 0826

Thornaby-on-Tees

99 Sadler Forster Way Teesside Industrial Estate Thornaby-on-Tees Cleveland TS17 9JY United Kingdom

Tel : +44 (0)1642 750009
Fax : +44 (0)1642 750044

Aberdeen

Site 1 Burnside Drive Dyce Aberdeen AB21 0HW

Tel: +44 (0)1224 241640
Fax: +44 (0)1224 241641